There are two separate components to our current housing problem–the need for “affordable housing” and the equally important need for housing that can be made affordable. The distinction might be subtle, but it is significant nonetheless.

What is generally thought of as “affordable” rental housing cannot be built today without deep government support. As illustrated in No Time To Lose: Stimulating Rental Housing Production in Boston, by the Greater Boston Real Estate Board’s Rental Housing Association, a newly-constructed, two-bedroom unit in the City of Boston takes $190,000 in capital and development costs and $6,000 in annual operating costs. Based on these numbers, a family of four earning the Boston median income of $62,700 faces a rent gap of $133 per month. At 80 percent of median, the gap widens to $498 per month. At 60 percent, the shortfall exceeds $1,097! Any discussion of new affordable housing for individuals or families at this level on the economic ladder without the renewed involvement of the federal government is fruitless.

Then there is housing that can be made affordable–that is, rental housing for those earning 80 percent to 120 percent of median income. This goal is feasible only if the obstacles that drive up development costs can be removed.

There is today, all across the Commonwealth, an attitude of Not In My Back Yard (NIMBY) or Build Absolutely Nothing Anywhere Near Anything (BANANA) that can bring the most determined builder to his knees. Throughout the regulatory process–win, lose, or draw–the developer is absorbing costs which will ultimately be passed along to the consumer (tenant). Every design revision requested by a party in the regulatory process requires additional architectural drawings. Every revision triggers further legal review and consultation, as well as financial analysis to make sure the project is still viable. From concept to completion, this cycle may repeat itself a dozen times or more.

Let’s consider a proposal for a 100-unit rental housing development in Boston. Such a project would require approval by no fewer than 22 different official agencies at the municipal level, as well as various community-review groups and eight different agencies of state government.

To reduce the run-up of development costs, larger urban communities need to establish one office to coordinate the review process on a specified timeline. It would be even better if that office provided clear and standardized rules for development options. If, for instance, the municipality allowed–or, better still, encouraged–development of three-story rental housing but required additional review for buildings exceeding three stories, a developer could either design the project at the pre-authorized height or pursue the requisite variances and approvals to build higher.

Such clarity of tradeoff is rare. That’s because zoning codes in most municipalities have not kept current with market demands. Many do not mention multi-family housing at all. Even to build a duplex–two units attached to each other–a builder needs all the approvals and variances required for a high-rise residential or office building.

The need for variances makes developers subject to the political whims of the local community. Such whims may serve to make housing less affordable, or even feasible. As a case in point, let’s consider “inclusionary zoning,” which makes approval contingent on a developer keeping a certain portion of units “affordable.” To meet that requirement, the developer must subsidize the affordable units with rents from the market-rate units, which therefore must be higher–that is, he prices more of units out of the reach of moderate-income renters.

One better way to encourage a mix of units is a so-called “density bonus.” Simply put, if a developer wishes to construct 100 units of rental housing, and the community wants 10 percent of those units to be “affordable,” the town could give permission for 125 units on the same site, with 10 percent affordable. In this way, the developer could defray the cost of the 12 affordable units with revenue from 13 additional market-rate units.

Numerous other measures could make rental housing less costly to produce. For example, communities could eliminate off-street parking requirements for rental housing projects in nonresidential neighborhoods. In metropolitan Boston, where the housing squeeze is particularly tight, an expedited review process could be implemented on a temporary basis until a balance in supply and demand is restored.

What often appears to be missing, however, is the political willingness to build rental housing. Some municipal officials see only increased costs for school, transportation, and recreation. But if supply is ever to catch up with demand, we must take thoughtful, creative, and determined action to encourage–not discourage–the development of rental housing throughout the Commonwealth.

Edwin J. Shanahan is chief executive officer of the Greater Boston Real Estate Board.